factory acceptance test meaning Secrets
For example, let’s say that the very first electronic output that Now we have here is linked to a motor by means of a contactor. The PLC software logic, says when the extent change one and level change 2 are both of those Energetic, we need to contain the motor linked to this output turned on.Jona Tarlengco is really a material author and tester